Big Almaty Ring Road

BAKAD

  • Main link of the transit corridor “Western Europe – Western China”
  • Population served – 2,000,000
  • Road category 1”a” toll road from scratch
  • The length – 66 km (4 and 6 traffic lanes)
  • CAPEX - $670млн2
  • Construction period – 50 months
  • Type of road surface – concrete/asphalt
  • 21 bridges, 19 overpasses
  • 8+4 transport interchanges (4 will be built by city administration during period of concession)

 

The importance of BAKAD

    Infrastructure

  • Reduced travel time
  • Construction of key link of the transport corridor “Western Europe – Western China” 

    Signaling effect 

  • The first major PPP in Kazakhstan
  • The first largest infrastructure project financed by private funds

 

Download associated files